BRFM reviews the City’s scope of study for the Hydrogeological/Geotechnical program (“SoS”) in support of the preliminary engineering phase of the City’s proposed Bowness Barrier project. BRFM requested the SoS from the City for review by an independent senior hydrogeologist. BRFM’s expert identified 10 concerns with the proposed study design and BRFM requested a meeting between City hydrogeologist and the senior hydrogeologist retained by BRFM. Please see the follow report for more detail.